Hello
I am trying to set up a program with our miterfold aggregate head to receive an initial route out with our down sheer bit. The idea is to get some of the material out of the way before the miterfold head makes its pass to help with tool life. I am having issues with assigning the priorities with the MV program. It wants to run the saw operation first then the route. When I use the "assign priorities to routes" option I get an error message when I try selecting the saw operation in the composite drawings after processing. If I use the "assign priorities to routes" while making the part in 2D part editor it doesn't give me an error but the priorities don't apply. Is there a way to do this so the route out happens first then the miterfold saw operation? We use a Homag CNC, is there a setting in woodwop potentially?
Thanks