Correct procdedure for drawing walls in 2D elevation?
Can some one tell me what is the correct procedure for drawing the return walls here. Every time I go to draw the wall with returns for the elevation I get the RETURN walls laid over on their sides.

MVU eLearning
Grow Your Knowledge
Follow along with RJ as he takes you on a journey to build your foundational knowledge of Toolbox.
Follow us on:
ERP for Millwork Shops
Discover how Microvellum and INNERGY streamline operations for cabinet shops and millwork manufacturers.