Design Manufacturing Report
Hello, I have 2 reports the first Old Nesting Master G-Code and the second New Nesting master G-Code. In each there is a filter to choose which processing station (linkidprocessingstation). Now I have created 2 new processing stations and I would like to modify the filters to take into consideration the new processing stations. Do I need to create 2 new reports or if I can just modify the filters. P.S where I can find the Linkidprocessingstation number. Can someone help me please P.s: I speak French only
Toolbox BSB Survey
Have you been using Toolbox BSB? We'd love to hear what you think!
Take the Survey
MVU eLearning
Grow Your Knowledge
Follow along with RJ as he takes you on a journey to build your foundational knowledge of Toolbox.
Follow us on:
ERP for Millwork Shops
Discover how Microvellum and INNERGY streamline operations for cabinet shops and millwork manufacturers.