Microvellum Community

Drawing Walls in Microvellum using BricsCAD

When you draw a polyline and right click on walls and choose "Select polyline path for wall" and MV draws the wall and applies the dimension over the wall, the dimension endpoints are connected to the wall and cannot be moved like it could when I was using MV and AutoCAD. So if you try to highlight just the dimension to move it up say 5" for a wall thickness, the wall layer highlights as well and will move with it. Is this a setting in BricsCAD or Microvellum that can be changed?

    Toolbox BSB Survey



    Have you been using Toolbox BSB? We'd love to hear what you think!

    Take the Survey

      MVU eLearning



      Grow Your Knowledge
      Follow along with RJ as he takes you on a journey to build your foundational knowledge of Toolbox.


        Follow us on:

                 

          ERP for Millwork Shops


          Discover how Microvellum and INNERGY streamline operations for cabinet shops and millwork manufacturers.