I am running
- Toolbox OEM 2025
- Build 20.1.616.641
What I have tried
- Company Setup --> Factory Variables --> Cost Based Settings --> Labour Rates
- Workbook Designer --> F Sheet --> Prompts --> Change labor rate in coloum M Row 1 - 11
- Workbook Designer --> F Sheet --> Prompts --> Change labor rate in coloum Ai Row 2 - 25
I've done all these after restarting MV, creating a new project, creating a new room.
I've also tried these steps with "Enable Project Factory Workbook" Checked and Unchecked.
Thank you,
Phillip