Microvellum Community

How do change the labor rates in the "Cost Based Estimating Report - Shop Quote Optimized Option" - Stimulsoft Design Report

I am running
  1. Toolbox OEM 2025
  2. Build 20.1.616.641
What I have tried
  1. Company Setup --> Factory Variables --> Cost Based Settings --> Labour Rates
  2. Workbook Designer --> F Sheet --> Prompts --> Change labor rate in coloum M Row 1 - 11
  3. Workbook Designer --> F Sheet --> Prompts --> Change labor rate in coloum Ai Row 2 - 25
I've done all these after restarting MV, creating a new project, creating a new room.
I've also tried these steps with "Enable Project Factory Workbook" Checked and Unchecked.

Thank you,
Phillip

    MVU eLearning



    Grow Your Knowledge
    Follow along with RJ as he takes you on a journey to build your foundational knowledge of Toolbox.


      Follow us on:

               

        ERP for Millwork Shops


        Discover how Microvellum and INNERGY streamline operations for cabinet shops and millwork manufacturers.