How long would it take you to process ~500 cabinets into a Work Order?
We process approx. 9000 cabinets per week. We have work orders that range in size from 10 cabinets to 1500 cabinets. We are struggling with the slow speed in which Work Orders get created (500 cabts would take around 5 hours). Processing the batch is much faster. The speed back in MV6.7 was faster than what we are seeing in MV7.0. We do have a custom product library that uses formulated materials, so we're wondering how ours compares with MV's libraries or other custom ones.
So... approximately how long would it take you to process a 500 cabinet W.O.?
Or, if you don't do W.O.'s that large, what about 100 cabinets?
Toolbox BSB Survey
Have you been using Toolbox BSB? We'd love to hear what you think!
Take the Survey
MVU eLearning
Grow Your Knowledge
Follow along with RJ as he takes you on a journey to build your foundational knowledge of Toolbox.
Follow us on:
ERP for Millwork Shops
Discover how Microvellum and INNERGY streamline operations for cabinet shops and millwork manufacturers.