Microvellum Community

How to Update a Project with the Latest Library Specification Groups Data

Hello,
I have a project from last year that I want to add cabinets to and I want my latest library changes to be part of this addition. How do I go about changing that project's specification groups with the latest library data. I understand that this type of change only affects drawings going forward and not what was drawn prior. Would this be done with the database explorer or through the project specification groups?

    Toolbox BSB Survey



    Have you been using Toolbox BSB? We'd love to hear what you think!

    Take the Survey

      MVU eLearning



      Grow Your Knowledge
      Follow along with RJ as he takes you on a journey to build your foundational knowledge of Toolbox.


        Follow us on:

                 

          ERP for Millwork Shops


          Discover how Microvellum and INNERGY streamline operations for cabinet shops and millwork manufacturers.