Microvellum Community

Is there a way to update the project level workbook from the library one?

Is there a way to quickly update the project level workbook, instead of manually doing every change for every project? I make a change in the library spec groups workbook designer and would like to update old projects to have that modified workbook. The sync from database doesn't seem to update the workbook and I don't see any obvious way to update it.

    Toolbox BSB Survey



    Have you been using Toolbox BSB? We'd love to hear what you think!

    Take the Survey

      MVU eLearning



      Grow Your Knowledge
      Follow along with RJ as he takes you on a journey to build your foundational knowledge of Toolbox.


        Follow us on:

                 

          ERP for Millwork Shops


          Discover how Microvellum and INNERGY streamline operations for cabinet shops and millwork manufacturers.