When adding a new shop drawing into a job how do you specify the correct drawing template. I have a drawing template and was wanting to use it but anytime I go to load into a new drawing it doesn't transfer into the project.
- Cam M
Toolbox BSB Survey
Have you been using Toolbox BSB? We'd love to hear what you think!
Take the Survey
MVU eLearning
Grow Your Knowledge
Follow along with RJ as he takes you on a journey to build your foundational knowledge of Toolbox.
Follow us on:
ERP for Millwork Shops
Discover how Microvellum and INNERGY streamline operations for cabinet shops and millwork manufacturers.