Feature Request: Product List / Overdrive: Jump to Current Room
I wish the Product List would automatically start with or jump to the 'current room' selected in the project tree.
I think, for large jobs at least, this would at least help Product List / Overdrive load faster as it wouldn't need to load the entire list of products in the project at startup. Jumping to the current room would have the likely benefit of showing the products most relevant to the user more quickly.
In our case, with large projects there could be 1000s of products in the project. PL/OD often takes about 10-30 seconds to load.
I suppose this functionality should have a check box option somewhere to enable/disable for those that disagree. Another alternative could be a button in the ribbon area to 'jump to current room', but this wouldn't help the loading time problem.
Toolbox BSB Survey
Have you been using Toolbox BSB? We'd love to hear what you think!
Take the Survey
MVU eLearning
Grow Your Knowledge
Follow along with RJ as he takes you on a journey to build your foundational knowledge of Toolbox.
Follow us on:
ERP for Millwork Shops
Discover how Microvellum and INNERGY streamline operations for cabinet shops and millwork manufacturers.