currently if we add a piece of hardware i add it to the template and if a lock or pull changes on an old project i have just clicked the hardware and global components and reverted them from the template however it also reverts global settings, such as drill for locks, etc. and this has become an issue because something that seems minor after 6 months or a year when we get an updated asi from an architect, its hard to keep track of what changed etc. and its started biting me in the butt. so i am searching for a workaround, i have tried importing a custom spec group from the template, but this still requires knowing what is different from the global, so i have thought of putting more things into the project wizard so that it is "locked" from the global variable and wont revert but this is quite an undertaking and i am afraid of bloating the project wizard, so right now i am going line by line and checking the globals, it would be nice if we could print out/ export the globals as a pdf so that i didnt have to take screenshots but right now that is my only option besides adding a piece of hardware to the template, validating it, then adding to the current project, i was wondering if there were any workarounds or methods of importing new hardware to old projects that i didnt think of, thanks in advance. thomas