Hi,
Have added some formula driven materials in my hardware library.I have pointed the costing of these items to a wizard prompt but no matter what I do the cost of the item stays the price of the library specification group and not the project specification group. Works with material and edging but once in the work order it is the original cost from the template. Any ideas?
Toolbox BSB Survey
Have you been using Toolbox BSB? We'd love to hear what you think!
Take the Survey
MVU eLearning
Grow Your Knowledge
Follow along with RJ as he takes you on a journey to build your foundational knowledge of Toolbox.
Follow us on:
ERP for Millwork Shops
Discover how Microvellum and INNERGY streamline operations for cabinet shops and millwork manufacturers.