Microvellum Community

Parts Excluded from Optimization

Using multiple sheet sizes of a certain material we sometimes get an error 'there is not enough material' for a given material when processing. We can usually resolve the error by adjusting sheet quantities and optimization priorities using the Modify Work Order command until we find the sweet spot. The problem, this really slows things down with large complex projects!

If the program contained a way to know which parts were excluded from the optimization the user could then decide what action to take instead of the current trial and error method of adjusting materials and then reprocessing, sometimes more than once?

Your thoughts?

    Toolbox BSB Survey



    Have you been using Toolbox BSB? We'd love to hear what you think!

    Take the Survey

      MVU eLearning



      Grow Your Knowledge
      Follow along with RJ as he takes you on a journey to build your foundational knowledge of Toolbox.


        Follow us on:

                 

          ERP for Millwork Shops


          Discover how Microvellum and INNERGY streamline operations for cabinet shops and millwork manufacturers.