Accuracy – Sets the accuracy that displays in the spreadsheet and reports. If you are using an imperial configuration, you need to set this value to the precision of decimals or fractions. If you are using a metric configuration, enter in a value for how many numbers to display after the decimal.
Fractions/Decimals Radio Button – Selects how the spreadsheet, prompts interface, and reports display numeric values.
Convert to Metric – When using an imperial configuration, the convert to a metric checkbox will convert the reports to metric values when processing the work order. To convert g-code to metric values, use the setting within the tool file.
Sequence – Determines whether an item number increments by a whole number (1.00, 2.00, 3.00…) or decimal (1.01, 1.02, 1.03…).
Increment By – Determines whether item numbers increment across an entire project or if the sequence is restarted for every new room in the project.
The Edgebanding for Part Labels setting controls edgebanding representation in the part picture of reports and labels. Edgebanding can be designated either as a thick line or with an X on the line.
Controls the Part Origin representation in the part picture of reports and labels.
Default Name of Project Locations – Enter the default name used in the interface for project locations.
Project Viewer Type – Changes how you create and navigate the Project Viewer Dialog. Simple View displays a list of Project Names. Tree View displays a structure list of Project Names categorized by a user-defined category structure.
Use the drop-down menu to select the preference profile to use. Preferences determine the custom tool strip used by the program. Refer to the custom tool strip section for additional information.
Edit Hidden Message Boxes- Selecting this option opens the Edit Hidden Message Boxes interface which allows the user to unselect messages that have previously been hidden.
This option is only available if a message has previously been hidden.
The Use Manual Completion checkbox controls the completion method of scheduled project activities. Check it to enable manual marking of completion. Leave it unchecked to allow the project to be marked as completed based on the schedule placed in the Project Properties interface.