The following release notes apply to Toolbox build 23.1.1120.641
New Report Group Option
Figure 1: Report Groups (All Batches)- A new option has been added within the processing center to assist in streamlining user reports. The option Report Groups (All Batches) has been added to the processing center under the Reports section, an option that enables users to set up their reports to display multi batch report groups, if desired. This option is compatible with standard setups as well as setups using UWO databases (users will receive a warning if their batch is not compatible).
Dual Head Machine Barcode Fix
- An issue was reported regarding dual head machines and an error wherein they would produce face 6 machining labels, despite the file being converted to face 5 machining by default. Dual head machines are intended to only produce face 5 machining files, combining non-face 5 machining files into a singular face 5 file. However, when users attempted to generate a barcode on a face 5 file that was converted from a face 6 machining file, the barcode produced would still be face 6.
Pocketing with Router Drill Fix
Figure 2: Error message for unmatched tools.
- There was an issue with the incorrect usage of router drills that was reported by users. Users without a drill bank or who set up a router drill tool while lacking a matching router drill/routing tool would have operations running incorrectly, due to not being warned or having any error dialogue occurring when routing without the necessary tool installed on their machine. Instead, the system would use their vertical drill as a routing tool, even if it was not up to the correct specifications for the operation. This issue has been resolved: if a non-matching drill bit can’t be found, the operation will be dropped by the system, and users will get a corresponding error message akin to Figure 2.
Horizontal Boring Fix
- An issue was reported wherein users had an error occurring during the creation of a work order containing products that had horizontal boring applied. Any attempt to process work orders with this issue happening would result in the horizontal boring being removed or simply not showing on the products. This issue has been resolved- horizontal boring should no longer be removed from products, and errors should no longer occur when products with horizontal boring applied are present in the work order.