Copy a "Product" or a "Vertical"

Copy a "Product" or a "Vertical"

I learned from  my use of "EPB" that every line segment created is to have its own/separate "Vertical". I believe the reason is: if one "Vertical" was used for the whole die wall being drawn, eventually there would be conflicts within the "Data".

Does that same philosophy hold when copying a product I.E. upper cab ten times in a job layout and making modifications to them on an individual basis?


    MVU eLearning



    Are You Ready to Streamline the Way You Learn?
    Follow along with RJ as he takes you on a journey to build your foundational knowledge of Toolbox.


      Follow us on: