2025 Builds
Microvellum Foundation Library Release Notes | Build 25.0418
The following release notes apply to Microvellum Foundation Library build 25.0418. Additions Added a new Cost Based Estimating Report, “Shop Quote Optimized Option”. Instead of using the square footage plus waste, this will use the actual optimized ...
Microvellum Foundation Library Release Notes | Build 25.0319
The following release notes apply to Microvellum Foundation Library build 25.0319. This update introduces many new global variables. Any existing projects will naturally not contain these new variables, causing issues when adding new products to ...
Microvellum Foundation Library Release Notes | Build 25.0124
The following release notes apply to Microvellum Foundation Library build 25.0124. Additions Added Century Components Waste Bins, Vanity Organizers, and Base Cabinet Organizers. 11”, 14”, 17” Signature Series Bottom Mount 34qt & 50qt. 4”, 5”, 6”, 9”, ...
Microvellum Foundation Library Release Notes: 2021-2025
This document catalogs all versions of the Microvellum Foundation Library released between the years of 2021-2024. This encompasses builds 20.1201 to 25.0523 (current). To download the Foundation Library in one of the builds listed in this document, ...